|
71 |
An observational study of the cause and frequency of prescription rework in community pharmacies Enthalten in International journal of clinical pharmacy Bd. 45, 9.5.2023, Nr. 4, date:8.2023: 903-912
|
|
|
72 |
Application of Digital Twin technology in high-precision assembly: structural accuracy analysis and rework optimization for large-scale equipment Enthalten in The international journal of advanced manufacturing technology Bd. 138, 30.4.2025, Nr. 3-4, date:5.2025: 1229-1250
|
|
|
73 |
Complexity in rework cells: theory, analysis and comparison Enthalten in Operational Research Society: Journal of the Operational Research Society Bd. 57, 6.7.2005, Nr. 5, date:5.2006: 593-602
|
|
|
74 |
Developing a Workflow for Transforming BIM Models into Immersive Virtual Reality Experiences Enthalten in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences Bd. XLVIII-4-2024, 2024: 485-492. 8 S.
|
|
|
75 |
Effect of heat shield locations on rework-induced thermal management in ball grid array solder joint Enthalten in Scientific reports Bd. 12, 6.9.2022, Nr. 1, date:12.2022: 1-12
|
|
|
76 |
Effect of inspection and rework of probabilistic defective production on two-layer supply chain incorporating deterioration and reliability dependent demand Enthalten in International journal of system assurance engineering and management Bd. 12, 11.5.2021, Nr. 3, date:6.2021: 565-578
|
|
|
77 |
Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework Enthalten in Operational Research Society: Journal of the Operational Research Society Bd. 45, 1.7.1994, Nr. 7, date:7.1994: 797-805
|
|
|
78 |
Fast and accurate Zero-defect manufacturing using collaborative real-time photogrammetry Enthalten in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences Bd. XLVIII-1-2024, 2024: 495-502. 8 S.
|
|
|
79 |
Harnessing machine learning and structural equation modelling to quantify the cost impact of rework in bridge projects Enthalten in Asian journal of civil engineering Bd. 25, 3.4.2024, Nr. 5, date:7.2024: 3929-3941
|
|
|
80 |
Identifying the Most Important Rework Factors in Building Projects and Providing a Solution to Reduce Their Effects Enthalten in Institution of Engineers, India. Karnataka State Centre: Journal of the Institution of Engineers (India) / Series A Bd. 102, 25.8.2021, Nr. 4, date:12.2021: 1027-1043
|
|