|
101 |
Frontmatter and Editorial Enthalten in Gender forum Bd. 16, 2017, Nr. 6 [66]
|
|
|
102 |
A joint internal production and external supplier order lot size optimization under defective manufacturing and rework Enthalten in The international journal of advanced manufacturing technology 7.11.2017: 1-20
|
|
|
103 |
An economic production model for deteriorating items and time dependent demand with rework and multiple production setups Enthalten in Journal of industrial engineering international 25.4.2017: 1-14
|
|
|
104 |
Some Observations to: Lot Sizing with Non-zero Setup Times for Rework Enthalten in International journal of applied and computational mathematics 31.3.2017: 1-7
|
|
|
105 |
A surface response optimization model for EPQ system with imperfect production process under rework and shortage Enthalten in Opsearch 7.2.2017: 1-17
|
|
|
106 |
Leitfaden Rework elektronischer Baugruppen Frankfurt am Main : ZVEI - Zentralverband Elektrotechnik- und Elektronikindustrie e.V., Fachverband PCB and Electronic Systems, 2016, Stand Oktober 2016
|
|
|
107 |
Mesh based Scene Evaluation Metrics for LOD and Simplification Kolb, Daniel, 2016
|
|
|
108 |
Method for efficient determination of material properties for modelling aluminium welding processes Enthalten in Materials science and engineering technology Bd. 47, 2016, Nr. 11: 1140-1152. 13 S.
|
|
|
109 |
Makespan minimization for batching work and rework process on a single facility with an aging effect: a hybrid meta-heuristic algorithm for sustainable production management Enthalten in Journal of intelligent manufacturing 2.6.2016: 1-13
|
|
|
110 |
Virtual design and construction of plumbing systems Enthalten in Open engineering Bd. 6, 2016, Nr. 1. 7 S.
|
|