|
141 |
Determining the optimal production policy for a system with imperfect production and shortage Enthalten in Proceedings in applied mathematics and mechanics Bd. 7, 2008, Nr. 1: 2060077-2060078. 2 S.
|
|
|
142 |
New technologies to study effects of physical disturbances at the sediment-water interface: The development of an Integrated Sediment Disturber (ISD)(Vortrag) Soltwedel, Thomas, 2007
|
|
|
143 |
Pleasure is pretty Berlin : Daniel Wiest ; Stuttgart : Dietmar Bosch ; Hamburg : Indigo, Vertrieb, 2007
|
|
|
144 |
Unique software bridges the gap between cooling curves and the result of hardening ∗ Enthalten in HTM - journal of heat treatment and materials Bd. 62, 2007, Nr. 3: 110-115. 6 S.
|
|
|
145 |
Body rework Köln : EMI Music Germany, P 2006
|
|
|
146 |
New technologies for the study of ecosystem consequences of seabed disturbance (Poster) Hasemann, Christiane, 2006
|
|
|
147 |
Laserstrahlbasiertes Reparaturlöten in der Elektronik‐Produktion Enthalten in Materials science and engineering technology Bd. 36, 2005, Nr. 2: 69-74. 6 S.
|
|
|
148 |
Two Examples of a Successful Multivariate Quantitative Analysis in Industry Enthalten in Stochastics and quality control Bd. 20, 2005, Nr. 1: 69-79
|
|
|
149 |
Batching work and rework processes with limited deterioration of reworkables Magdeburg : Univ., Fak. für Mathematik, 2004
|
|
|
150 |
Holler Berlin : Monika Enterprise, 2004-03-08
|
|