|
151 |
Effect of inspection and rework of probabilistic defective production on two-layer supply chain incorporating deterioration and reliability dependent demand Enthalten in International journal of system assurance engineering and management Bd. 12, 11.5.2021, Nr. 3, date:6.2021: 565-578
|
|
|
152 |
Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework Enthalten in Operational Research Society: Journal of the Operational Research Society Bd. 45, 1.7.1994, Nr. 7, date:7.1994: 797-805
|
|
|
153 |
Fast and accurate Zero-defect manufacturing using collaborative real-time photogrammetry Enthalten in The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences Bd. XLVIII-1-2024, 2024: 495-502. 8 S.
|
|
|
154 |
Harnessing machine learning and structural equation modelling to quantify the cost impact of rework in bridge projects Enthalten in Asian journal of civil engineering Bd. 25, 3.4.2024, Nr. 5, date:7.2024: 3929-3941
|
|
|
155 |
Identifying the Most Important Rework Factors in Building Projects and Providing a Solution to Reduce Their Effects Enthalten in Institution of Engineers, India. Karnataka State Centre: Journal of the Institution of Engineers (India) / Series A Bd. 102, 25.8.2021, Nr. 4, date:12.2021: 1027-1043
|
|
|
156 |
Lot sizing with non-zero setup times for rework Enthalten in Journal of systems science and systems engineering Bd. 17, 3.6.2008, Nr. 2, date:6.2008: 230-240
|
|
|
157 |
Manufacturing costs in serial production systems with rework Enthalten in Operational Research Society: Journal of the Operational Research Society Bd. 61, 4.3.2009, Nr. 2, date:2.2010: 342-351
|
|
|
158 |
Microstructure and Reliability Comparison of Different Pb-Free Alloys Used for Wave Soldering and Rework Enthalten in Journal of electronic materials Bd. 38, 25.8.2009, Nr. 12, date:12.2009: 2628-2646
|
|
|
159 |
Multi-echelon green supply chain model with random defectives, remanufacturing and rework under setup cost reduction and variable transportation cost Enthalten in Sādhāna Bd. 46, 13.10.2021, Nr. 4, date:12.2021: 1-18
|
|
|
160 |
Multi skill project scheduling optimization based on quality transmission and rework network reconstruction Enthalten in Scientific reports Bd. 15, 19.4.2025, Nr. 1, date:12.2025: 1-35
|
|